Professional Experience
Name of Firm: Ontracks Consulting
Services, Houston TX, November 2014 - Present
Title: Managing Consultant - EAM
Maximo/EAM Projects with Ontracks include:
1.
Maximo
Upgrade and Improvements project – a large petroleum refining and nitrogen
fertilizer manufacturing company based out of Houston Texas. March
2015 to Present.
The goal was to upgrade the client’s EAM environment from
Maximo 6.2 to Maximo 7.6. This was executed using a re-implementation
approach, factoring in process improvements based on EAM best practices,
consolidation of two legacy implementations of Maximo 6.2 and integrations
to ORACLE EBS, SAVVION and Contractor Time Management System (CTS).
-
Developed EAM business process flows based on requirements
gathered in Functional workshops
-
Conducted gap analysis between Maximo 6.2 legacy
applications and targeted Maximo 7.6 applications
-
Collaborated on Maximo Work Flow design and development to
regulate To-Be business processes
-
Analyzed Data Migration requirements and developed data
mappings and Maximo Integration Framework (MIF) data loading templates for
specific objects such as GL Components, GL Accounts, Locations, Assets,
Items, and Vendors, Persons, Labor, Service Requests etc.
-
Extracted, Transformed and Loaded (ETL) identified data from
the legacy Maximo 6.2 objects to the targeted Maximo 7.6 objects in the DEV
environment, utilizing SQL Developer, Excel, .csv files, and the MIF.
-
Based on identified requirements, configured Maximo
application screens, domains, conditions, application restrictions,
conditional UI, relationships, signature options, security groups, and
start centers
-
Authored and unit tested Test Cases for Work Management and
Procure to Pay (P2P) business processes
-
Assisted client with the first Conference Room Pilot (CRP)
to test the configured system, utilizing the prepared Test Cases
2.
Prepared
and delivered a 4 day workshop to a large Natural Gas, production and
distribution company based out of Pittsburg PA to demonstrate Maximo Oil
& Gas applications such as Management of Change (MOC), Investigations,
Operating Procedures, Operator Logs, Permits and Certificates, Permit to
Work, Qualifications, and Certifications using client specific data.
February 2015.
3.
Development
Lead for a customized Permits Applications solution at EP Energy, an
upstream Oil & Gas company operating in Texas, Louisiana and
UTAH. November 2014 – January 2015.
EPE’s goal was to track their Permits related data in
Maximo. Permit types included, Drilling and Work over, Flares, and
Commingling. Client also had a short window of opportunity to
complete this project and roll it over to Production. Their
preference was to use the Agile/Scrum methodology with continual
interaction with the key users to design the desired applications.
Delivered the solution on-time and on-budget as follows:
-
Initial review and documentation of high level requirements
-
Development of an overall approach consisting of cloned
Maximo applications to develop Permit applications
-
Configuration of cloned application screens, domains,
conditions, application restrictions, conditional UI, relationships,
signature options, security groups, and start centers
-
Continual interaction with key users to refine applications
iteratively
-
Development of an application migration plan to move new
configurations from DEV to TEST and PROD environments.
-
Utilizing Maximo migration manager to create migration
packages, migrate the configuration objects and perform post migration
steps to enable a complete solution in the target environment
-
Assisted key users with UATs to identify issues and resolved
them efficiently
Received written memo of appreciation
by the client for delivering a quality solution within a tight time frame.
Name of Firm: IBM – Global
Business Services., Houston TX, March 2013 – October 2014
Title: Managing Consultant – Asset
Management Systems
Maximo/EAM Projects with IBM include:
1.
Functional
Work stream Lead for the Design Phase at Boardwalk Pipeline (BWP), a
midstream company that provides transportation, storage, gathering and
processing of natural gas and liquids. April 2014 – August 2014
In this initial phase (OMS Release1), BWP’s goal was to
implement Maximo 7.5x to consolidate and manage the Asset and Inspection
processes for two of its major subsidiaries. To accomplish this goal,
integration with their GIS (ESRI) system as well as a 3rd
party managed operator qualification system was also required. IBM
provided a team of specialists to lead GIS, Integration, Data Migration,
Reports development and Functional work streams. An IBM project manager and
a Solution architect (SA) ensured proper planning and coordination.
As the functional work stream lead the following tasks were
accomplished:
-
Reviewed project background material and assessed Functional
work stream related considerations as well as interdependencies with other
work streams i.e. GIS, Integration, Data Migration, and Reporting.
-
Met with key client representatives to discuss Asset and
Work Management best practices as well as to determine the scope of
Inspection and Asset management processes for Release1.
-
Regularly liaised with other work stream leads and the SA to
discuss various aspects of the overall solution.
-
Developed a functional design strategy for how Maximo would
be used out-of-the-box without customization, to fulfill BWP’s preliminary
business process requirements.
-
Provided updates to the Microsoft Project based Schedule for
the Functional work stream activities including work break down by tasks,
resources, number of hours, start and end dates for each task.
-
Provided initial training, coaching and development to the
in-experienced consultant (CBD) assigned to my team in various areas e.g.
process flow development using Visio, effective workshop design using
PowerPoint, high level concepts of Enterprise Asset Management as well as
basic configuration of Maximo.
-
Working with the CBD consultant, developed material for
design workshops which included PowerPoint presentations aimed to
facilitate functional requirements through discussion of EAM best
practices; Visio based future state business process flows as well as Excel
based data needs.
-
Conducted over 15 design workshops as well as additional
focus group sessions to successfully identify key business requirements and
functional design for OMS Release1.
-
Continuously configured and refined Maximo Screens, Domains,
Data base tables and conditions based Security to demonstrate a potential
solution until the application design was fully accepted by the client.
-
Developed Maximo Start Centers for different roles based on
identified process requirements.
-
Delivered a comprehensive ACD (Application Configuration
Design) document.
-
Worked with an off shore IBM team to commence development of
Escalations and Automation scripting needed to complete the proposed
solution.
-
In addition to successfully meeting all functional design
milestones for this project, also assisted the Reports Lead in completing
design specifications for Maximo custom reports.
2.
Work
stream lead, IT Asset (AM) and Configuration Management (CfM) at Ameren
Energy, a major power generation and distribution company operating in the
Missouri and Illinois areas. November 2013 – March 2014
Client’s goal was to have an Integrated Operations Center
(IOC) to be in place by October, 2014 to support their Advanced Metering
Infrastructure program as they begin smart meter deployment and production
operations. In the first phase of this project IBM was engaged to
work with the client to identify key business requirements for the
implementation of the first release of this program.
As a work stream lead, my primary responsibilities were to
assist the IBM IOC team with the Asset and Configuration Management related
objectives included in the IBM SOW. I accomplished these objectives
by:
-
Review of project background material and assessment of work
stream related considerations
-
Meetings with key client representatives to discuss
ITIL/Best practices based AM/CfM business processes, and to determine a
pragmatic approach for implementation of specific processes in IOC release
1.
-
Development and scheduling of Business
Process Development (BPD) Workshops and pre-workshop review sessions
-
Development of an initial list of “IT Assets” with suggested
categorization/classifications to determine in-scope assets and CIs for IOC
release 1 as well as asset ownership, sources of existing data and
discovery methods.
-
A thorough review of the capabilities of the client’s chosen
ITSM/AM/CfM software tool; ServiceNow.
-
Identification of practical approaches for electronic
discovery of CIs/Assets as well as determining requirements for data
synchronization between external discovery tools and the ServiceNow -
CMDB/Asset repositories.
-
Providing initial training, coaching and development to the
CBD consultant assigned to my team in various areas e.g. process flow
development using Visio, effective power point presentations design, high
level concepts of Asset Management and Configuration management
disciplines.
-
Working with the CBD consultant, the development of material
for BPD workshops which included PowerPoint based presentations as well as
Visio based future state business process flows.
-
Delivering a series of BPD workshops in each in-scope AM/CfM
area and through discussion of best practices based process flows,
identified key business requirements for IOC release 1.
-
Working with the CBD consultant and collaborating with the
other IOC work streams (IT Service Management, Network Monitoring and
Management, IOC Ops, Org Change & Design), developed level 2 and level
3 process flows using the Blue Works Live (BWL) tool, for in-scope AM/CfM
business processes.
-
In addition, working with the CBD consultant developed two
types of Business Requirements Specifications that summarized the work
accomplished and detailed requirements in a traceable matrix.
-
Successfully met all project milestones and deadlines for
the requirements development phase of this project
3.
Management
Consultant, EAM Assessment and Functional Gap Analysis project at
Schlumberger, an International Oil and Gas Services company, Houston TX. June
2013 – August 2013
Client required an assessment of their current EAM
application landscape (7 home grown systems) to ascertain the gaps between
a best-of-breed EAM solution like Maximo and their legacy applications.
-
Conducted interviews with both the application SMEs as well
as key business users including worldwide VP of Maintenance, to understand
the key EAM business requirements and gaps at a high level
-
Rated each of the 7 legacy applications in 12 major EAM
areas using a formal capabilities matrix
-
Prepared a formal Gap Analysis document with detailed
assessment of each legacy application as well as summarized findings and
recommendations.
-
Contributed to an EAM Project charter (Business Case)
document
-
Contributed to a presentation for worldwide VPs of Operation
to discuss findings of the EAM assessment
4.
Test
Lead, Maximo Implementation project at Avista, a large Energy generation,
transmission and distribution company, Spokane WA. April 2013 – June 2013
Project involved a new Maximo 7.5 implementation with
integration requirements to various business systems including Oracle EBS,
Power Plant and others.
-
Primary responsibility was to assist in the planning of
formal testing cycles including System Testing, SIT and UAT and hand over
the plan to the clients testing team to execute.
-
My team included a Full time Senior Consultant and an
administrative resource. Other IBM consultants on the project were
engaged as needed to assist with the development of Test Cases.
-
Facilitated the formation of a formal Requirements
Traceability Matrix
-
Facilitated the traceability of requirements to functional
and technical specifications
-
Facilitated the division of requirements by testing cycles
(SYSTEM, SIT, UAT)
-
Facilitated the development of Test Scripts for System and
SIT testing
-
Facilitated the traceability of test scripts to
specifications and requirements
-
Developed and implemented a process for SYSTEM Testing cycle
which involved interaction collaboration and contributions between Testers,
Test Lead, Development Lead and Migration Lead
-
Developed and implemented a process for Defect tracking and
resolution through HP Quality Center
-
Monitored and QA the defects queue and assigned to relevant
resources
-
Coordinated the Defect Triage, Resolution and Regression
testing process
-
Provided management reporting on Testing cycle status and
metrics
-
Received generous appreciation by client for presenting a
joint testing approach.
-
Worked closely with client Test Manager to plan, develop and
administer testing related activities
-
Provided updates to the Microsoft Project based Schedule for
the Testing work stream activities including work break down by tasks,
resources, number of hours, start and end dates.
Name of Firm:
PricewaterhouseCoopers(PwC) LLP / BearingPoint Inc., Feb 2008 – March 2013
Title: Senior Consultant / PMO
Maximo/EAM Projects with PwC / BearingPoint include:
1.
Data
Migration Lead, Vancouver International Airport (YVR), Canada.
November 2011 – June 2012.
Project involved reimplementation of Maximo as part of a
consolidation and upgrade of two separate instances of Maximo running
different versions (ver. 5.2 and 7.1) and data from 3 separate functional
groups (Maintenance, IT, Operations) to a unified instance of Maximo v7.5
(Smart Cloud Control Desk) with EAM, ITAM and ITSM functionality.
Participated in various aspects of the project including project planning,
resourcing and costing, data migration, data cleansing strategy and
detailed planning, business requirements and process mapping, functional
application design, master data design, workflow design as well as
Maximo-Oracle ERP interface design.
-
Led the response to the YVR RFP, including proposal
development (technical/functional/resource requirements, solution
architecture, methodology, costing, and high level timeline) as well as
participation in Oral presentations. PwC was awarded the project due to our
comprehensive and competitive response.
-
Developed preliminary version of the Project Plan and
Schedule following PWC’s Transform methodology.
-
Identified, interviewed and secured appropriate resources
for the project.
-
Led the Data migration work stream by managing 3 team
members, including 2 separate contractors and one PwC consultant, to
identify, plan and track data related project activities.
-
Led daily meetings with the data team to define specific
tasks related to Data migration and cleansing and monitored their
progress.
-
Provided status of work stream progress to stake holders.
-
Developed and delivered Master data design workshops for
Locations, Assets, Items, Storerooms, Tools, Job Plans, PMs, Routes,
Classifications specifications, Safety Plans Lockouts and Tag-outs, Failure
Codes, Shifts, Calendars, Labor and craft, Warranty and Service
Contracts.
-
Developed Master data – functional design deliverables for
Locations, Assets and Items.
-
Developed a comprehensive "Data Migration
Strategy" and "Data Cleansing Strategy" together with a
detailed "Data cleansing execution schedule" as client
deliverables.
-
Developed and conducted Data Cleansing workshops.
-
Worked with the data team to set up the framework for Data
migration and Data cleansing execution.
-
Additionally, conducted functional design workshops to
validate business process requirements.
-
Developed Level 3 and Level 4 business process flows for
Work and Asset Management, Inventory Management, RMA (Return Material
Authorization) and Warranty and Service Contracts processes.
-
Formulated Questionnaires to collect additional details
around business processes in order to develop level 4 process flows and
prototypes for designing the solution.
-
Developed Team lead presentations for the business process
flows and worked with them to obtain sign off on deliverables.
-
Configured Maximo application screens, Domains, and Database
tables to facilitate design workshops.
-
Developed Workflows for Asset Management (Asset Creation,
Asset update, Asset decommission) for assets related to Capital and
Non-Capital projects.
-
Worked with both Oracle and Maximo developers to design the
functional interface requirements and data flow design for integration
between Maximo 7.5 and Oracle EBS. This MIF based interface design
included, Oracle GL to Mx COA, Mx PR to Oracle PO, Oracle PO to Mx PO, Mx
Receipts to Oracle Invoice, Oracle Invoice to Mx Invoices, Synchronization
of Organizations, Sites, and Suppliers.
2.
PwC
internal EAM project, May 2011 – September 2011.
-
Received SAP PM (Plant Maintenance) and MM modules,
functional/system training organized at PwC L.A.
-
Led the process of compiling requirements for a Utilities
industry template for the SAP PM module and Maximo.
-
Participated in the development of SAP and Maximo Industry
templates (accelerators) for utilities to be used by PwC for its clients to
help reduce their implementation timeframes and get them productive
rapidly.
3.
TVA,
a Tennessee based Utilities Company, September 2011 – November 2011.
-
Participated in an assessment of "Project
accounting" systems and EAM processes.
-
Analyzed impact of changing the supply chain processing from
the EAM system (Maximo) to the ERP (Oracle EBS) in terms of integration and
interfaces, data migration /conversion, training and implementation as well
as level of effort associated with each.
-
Interface considerations between Maximo and Oracle EBS
included Accounts Payables, GL, Projects, Vendors, Receipts, PRs, and POs.
4.
Eli
Lilly and company - Pharmaceuticals, Maximo system upgrade / Data Migration
project, Indianapolis, IN Feb 2009 - November 2009
-
Participated in a full life cycle project to upgrade the
Company’s MAXIMO single site system to the latest release of Maximo,
migrating the data to a complex multi-site set-up.
-
Developed, tested and ran PL/SQL scripts to migrate data
from Maximo 4.11 to Maximo 6.2, as well as to test, validate and verify
migrated data. Analyzed and resolved data and script issues.
-
Loaded discovered (external) data into Maximo using sql
loader and MDL (Maximo Data Loader).
-
Ran post migration data validation tools. Trouble shot and
resolved issues with the data as well as the validation tools.
-
Assisted the QA/Testing team with in-formal and formal
testing of the system, post data migration.
-
Data Migration and upgrade was completed successfully and as
scheduled.
5.
KBR
(Kellog Brown and Root) inc, Maximo System/IT Support and upgrade projects,
Houston, TX, 2008-2009
-
Provided technical and functional support for the
international implementations (Iraq, Kuwait, Afghanistan, Kosovo, Djibouti)
of MAXIMO 5.x and MAXIMO 6.x EAM systems.
-
Resolved a significant back-log of Maximo issues in a
remarkably short time frame and earned a 9 month extension to the initial 3
month engagement.
-
Trained and developed internal KBR resources to become
self-sufficient in supporting the Maximo implementations.
-
Developed PL/SQL scripts to update data via the back-end to
resolve system issues as well as to load mass external data into Maximo.
-
Assisted in a Data migration/upgrade (Maximo 5.2 to Maximo
7.1) project by conducting Data mapping between the old and new versions as
well as performing system configuration in the new version.
-
Worked with the QA and Network support teams to set up
application performance and network latency testing using Load runner
automated testing tool.
Name of Firm:
Jacobs Engineering, NASA - Johnson Space Center, O&M Contract, Houston,
TX 2007-2008
Title: Project Lead / Maximo
Consultant.
-
Led the 2nd phase of the Maximo – Enterprise Asset
Management (EAM) system implementation as a project coordinator and
functional lead.
-
Developed and implemented an EAM vision to effectively
leverage the investment in Maximo as well as exploiting relevant technology
solutions that could add significant business value to the Maximo
implementation. E.g. utilizing Mobile technology with Hand Held
devices to conduct inventories, equipment audits, Shipping and Receiving as
well as work order management with interfaces to Maximo.
-
Other personal initiatives included Maximo integration with
MS Project and Peoplesoft HRM system, as well as utilizing the Cloned
Applications and Work Flow capabilities to track Testing and Manufacturing
Work Orders in Maximo in addition to maintenance work orders.
-
Developed a detailed requirements specification for a Mobile
Maximo solution.
-
Developed and modified signification number of SQL and
Crystal reports for Management Information needs.
Name of Firm: Texas Instruments -
IT Design Systems, Dallas, TX 2002-2003
Title: Project Manager - AMS
-
Held project level responsibility for business process
improvement related to a Remedy© based AMS (Asset Management System).
-
As a technical liaison, and leading the AMS focus group
managed the delivery of 15 time/cost saving enhancements within a 12 month
period.
-
Worked with end-users to discover business/operational
issues as well as systems enhancement needs.
-
Established user permissions based on management approved
data access needs.
-
Authored detailed AMS “enhancement requirement” documents
including VISIO based process diagrams, test/use cases, as well as training
material to implement the new enhancements.
-
Coordinated and participated in the testing process of AMS
enhancements pre-release prototypes.
-
Developed variety of departmental and enterprise level
reports from AMS and problem tracking systems using Crystal Reports, and
Remedy report writer with a heavy emphasis on metrics.
-
Developed content and design for AMS related information to
publish on the departmental website.
-
Worked as an internal account manager to assist the business
units that utilized IT design systems computer resources
Name of Firm: PSDI/MRO Software
(Maximo OEM now part of IBM), Dallas Texas, 1998-2000
Title: Maximo Sr. Pre-Sales
Support Engineer
-
Delivered Maximo EAM (enterprise asset management /
maintenance management) software solutions that enabled organizations to
automate and manage internal and external service and support processes as
well as manage the life cycle and maintenance of their capital intensive
assets.
-
Carried out prospect site surveys, collecting key
information on business processes and user issues. Based on
prospects’ needs, modeled demonstration data, customized/tailored product
screens, produced key analysis using Crystal Reports, and formulated demo
paths for presentations.
-
Conducted technical demonstrations of Maximo software
products.
-
Performed system administration of Maximo applications and
database.
Name of Firm: NCSC - IT Consulting
/ Software re-seller, Jeddah, Saudi Arabia 1993-1998
Title: Pre-Sales Support Manager
-
Led the implementation of Maximo EAM and Tetra ERP systems
at various clients across Saudi Arabia as Project / Engagement Manager. The
projects involved a wide variety of clients including Oil & Gas,
Utilities, and Manufacturing as well as Engineering, Construction and
Contracting firms. Some of the clients included:
•
LUBEREF (Oil Refineries) Jeddah, Yanbu, Saudi Arabia.
•
YANPET (Yanbu Petrochemical Company), Yanbu Saudi Arabia.
•
PETROKEMYA (Petrochemical), Al-Jubail, Saudi Arabia.
•
SAVOLA (Food Industries), Jeddah, Saudi Arabia.
-
Held management level responsibility for the pre-sales
support of packaged application software systems, including TETRA, MAXIMO,
NCSC financials, and COGNOS tools.
-
Carried out software requirements analysis at prospective
clients, and customized/tailor the application software to conduct
effective demonstrations of product functionality.
|